Hello
138results for ""
Nithin Ramakrishnan, a native of Palakkad, had sought the Court in the appeal, to rule on the implementation of the guidelines, including that on the service time at the toll plazas, in the policy circular issued by the NHAI on May 24, 2021.
NHAI calls the West Coast Canal just a proposal, refuses to demolish the 66-year-old two-lane bridge. The old bridge is only 0.8m above the high flood line; the required height above the state waterway is 4m.
Protests had erupted after the highway stayed closed to commuters despite its construction being complete.
The construction of the 2.72 km-long flyover, the longest four-lane elevated highway in the state, was started in December 2018.
The union minister has hailed the former prime minister for giving India a new direction.
Avoiding using such joints till endurance exercise is done, says report submitted to NHAI
The workers, atop a 6-metre-high stage, were pouring in pumpable concrete to make the slab when the supporting pipes underneath gave away.
The incidents drew widespread condemnation after the photos and videos of the same were widely shared on social media platforms.
The HC asked the State to not to play a 'hide and seek' game with the court.
At the time of the accident, the tourist bus was moving at a speed of 97.7 km per hour. The average speed from the trip's start was 84.2 km/hour.