Follow Whatsapp Channel
Tuesday, Jun 10, 2025
With dedication and discipline, Radha quietly cleans Kaduvakulam Junction before dawn each day.
While that dream finally began to take shape with the completion of the Koyambrathu Kandi Bridge.
Despite being constructed to BM (Bituminous Macadam) and BC (Bituminous Concrete) standards, the bypass suffers extensive damage every monsoon.
With dug-up roads, heavy traffic and a lack of basic safety infrastructure, navigating the way to school has become a daily struggle.
As heavy rains make Panampilly Nagar-Thevara road extremely dangerous for vehicles, incidents of four-wheelers and two-wheelers falling into pits dug by utility services are common. On Saturday, when a car fell into a large pothole on Koithara Road at half past midnight, it was a nightmarish
Different government departments seem to have laid together a maze of hazards waiting for you.
The cracks had initially appeared on Thursday on a nearby overbridge, stretching nearly 50 meters.
Pinarayi said that the ongoing work should not be affected by these incidents.
KNR Constructions was awarded the construction contract for the highway segment, while consultancy services were provided by HEC.
IUML units will start an agitation on Thursday.
Results 1-10 of 91
You can always sign back in at any time.
You have reached the maximum number of saved items. Please remove some items.