Follow Whatsapp Channel
Tuesday, Jul 8, 2025
The stretch between Model School Junction and Aristo Junction has become a commuter’s nightmare, with long-distance buses stopping abruptly and potholes hampering vehicle movement.
Local residents and associations say their repeated pleas have gone unheard.
The decision triggered protests from residents who were caught unaware by the sudden halt in services.
He has been making regular visits to police stations and courts without fail.
This misery unfolds along the 12.75-kilometre stretch between Aroor and Thuravoor.
During the rains, the entire stretch becomes submerged, making it nearly impossible even for pedestrians to use the road safely.
The protest, in which the activists filled the potholes on the road with soil and planted the saplings.
Despite being constructed to BM (Bituminous Macadam) and BC (Bituminous Concrete) standards, the bypass suffers extensive damage every monsoon.
Different government departments seem to have laid together a maze of hazards waiting for you.
The massive pothole is a permanent fixture near Chandragiri bridge on Kasaragod-Kanhangad road, built by the now blacklisted RDS Projects.
Results 1-10 of 18
You can always sign back in at any time.
You have reached the maximum number of saved items. Please remove some items.