Follow Whatsapp Channel
Sunday, Jul 6, 2025
Confusion brews in Eloor as a new signboard names the long-known Pathalam Bund as Edayar Regulator Bridge.
Following the closure, private buses have been forced to halt operations on either side of the bridge.
Nadal: The much-awaited Naranath Bridge, constructed across the Nadal River on the Nadal–Kizhunna–Ezhara Road, is set to be inaugurated on July 1. Minister P.A. Muhammed Riyas will open the bridge, which connects the regions of Nadal and Kizhunna. Spanning 33 metres in length and 11 metres in
As part of the repair work, new pipelines were laid over the bridge along the Athikkayam–Guru Mandiram–Kadumeenchira Road.
The authorities hope that the regular coaches required for the Rameshwaram train could be acquired when these trains are upgraded to LHB coaches.
The new route will connect Chathannoor Junction to the Ithikkara–Aayoor Road near Kaithakkuzhi Homeo Hospital via NSS School and Chennamathy Temple.
The protest was organised by the Vannayikkadavu Local Development Council.
The prolonged delay has forced students and daily commuters to take roundabout routes.
Their only link to the outside world is a hanging bridge fashioned from bamboo poles and secured with metal wires.
The water level in the Pallanchi canal had risen significantly in the heavy rain and the old Pallanchi bridge.
Results 1-10 of 55
You can always sign back in at any time.
You have reached the maximum number of saved items. Please remove some items.